What to check
Every grant carries a renewal date, and passing it changes the grant state without anyone needing to remember. Renewal packets cite new evidence rather than restating the original approval.
A grant of authority is held for a term against a renewable justification, not owned outright.
Jump to
Treating authority as a lease means a grant expires by default and continuing it requires fresh evidence. The burden of proof sits with the delegation, and it rises with the duration and the consequence of what has been delegated.
The alternative, treating authority as a title, makes silence the renewal mechanism: a system that has not visibly failed keeps its scope indefinitely.
Canonical entry: Authority as a Lease in the glossary.
Architecture
Visual model of operational states, transitions, boundaries, and failure points.
Mechanism, drawn
Treating authority as a lease means a grant expires by default. Silence is not renewal: continuing delegation requires fresh calibration evidence.
A vendor scoring model holds a twelve-month grant. At month twelve the grant lapses on its own, and the team must file a renewal packet with new calibration evidence before scoring resumes.
Implementation
Unique operational detail to help this concept stand on its own in policy, procurement, and review workflows.
Every grant carries a renewal date, and passing it changes the grant state without anyone needing to remember. Renewal packets cite new evidence rather than restating the original approval.
Renewal exists on paper but is performed as a batch rubber stamp, so the lease is functionally perpetual. Look at whether any grant has ever lapsed.
Report the median age of live grants against their renewal interval, and the count of grants that lapsed or were narrowed at renewal in the last year.
Doctrine
The invariant this explainer operationalizes, and the standard clauses that bind it.
Standard
Section 2.2 requires expiry and revocation conditions on every delegation.
Taxonomy
The capability branch covering versioned policy records and their review dates.
It means the grant stops authorizing new action until it is renewed. Whether that halts the system or drops it to a confirm-mode fallback is a design choice recorded on the grant.
Yes, if the term is justified by consequence and duration. The requirement is that the term is stated, enforced, and renewed on evidence rather than on the absence of complaints.